Image
Archive
People

Volume of reports by British science teachers on the 1867 Paris exhibition

Receipts for Shipping of Goods via Liverpool Road Goods Station

Marshall's Geological Diagrams

LNWR Liverpool Road Station Manchester

Temporary staging

General arrangement drawing no 11322

Drawing of 0-6-0 Engine

Drawing of 0-6-0 Engine

Letter from Charles Eade to Henry Pease

General plan of Analytical Engine, quarter size.

Store variable selectors. Superseding drawing No 2.

Sketch of mould for adding column collars.

Motion for carrying the tens, plus and minus.

Half zero anticipating carriage with three plates in each cage.

Whole zero anticipating carriage with one plate in each cage.

Untitled plan and elevation. Incomplete.

Adding column with motion for changing from plus to minus. Incomplete.

Untitled. A model of six cages was made from this drawing. Incomplete.

Half size plan and side elevation of three moveable platforms of which the two lower are abolished

Whole zero and half zero, three figures.

Whole zero and half zero.

Half zero details including warning plate.

Figure No. 11. Half zero carriage with hoarding. Incomplete details.

Circular half zero carriage. Plans No. 8 - 10.

Plans for store variables.

Untitled details. Incomplete.

Details of circular pattern half zero. Incomplete.

Untitled details. Incomplete.

Untitled. [Drawings of cams]

Letter from R. Thompson & Co to Henry Pease

Letter from Alfred Jobson to Henry Pease

My Machine 1888 II Plan of driving cams, levers, etc. in initial position.

My Machine 1889 III Development of driving cams.

Locking motions for carriage column.

Scribbling Book Volume XIA.

Drawing entitled 'Sectional Drawing for a Steel Protected Cruiser for Colonial Defence to be named'

The Tower Bridge

Temporary staging

An edition of 'The Photogram' journal vol. 2 no. 17

An edition of 'The Photogram' journal vol. 5 no. 50

Railway Signal Volume 3 (1885)

Letter from S. Lutterton to Henry Pease

Rising platform and selectors for variable columns in store one to each half of store. Quarter size.

Plans for the moulds for anticipating carriage.

General plan of the Analytical Engine, half size.

Print apparatus as made in the large model.

Mould for wheel of eighty teeth. Adding column.

Mould for warning pinion.

Probably a plan of carriage and figure columns.

Plans for figure wheels, area for reducing to neutral position, carriage axes and locking arms.